Delivery-route calculator

Delivery-route profitability calculator

Enter facilities, kilometres, fuel, the driver and the van. You will see the route cost per day and per month, transport per facility and per portion — and from how many portions and up to how many kilometres the loop still holds.

One route, one vehicle, one driver. Net amounts. Vehicle cost is lease, insurance, service and depreciation allocated to this loop — not the whole fleet.

Route

You count one loop: as many facilities as the van visits in a day.

sites

Stops on this one route, not the whole company.

km

The loop from the kitchen and back.

Fuel

Kilometres per day are the round trip, not the distance to the first drop-off.

l/100 km

Real use of this van, not the brochure figure.

PLN/l

The net pump price you actually pay.

Driver

Loading, driving and unloading time allocated to this route.

h/day

Load + drive + unload for this route.

PLN/h

Employer gross cost or the contractor rate.

Vehicle

Monthly cost of the van on this loop, spread over feeding days.

PLN/month

Lease, insurance, service, depreciation of this van.

days/month

Days the van actually goes out — not the calendar month.

Portions and cap

Portions that actually leave. The cap is how many zloty of the lunch price you can spend on delivery.

portions

Portions issued on this route, not the enrolment list.

PLN

How many zloty of the lunch price you can spend on delivery. Typically 0.80–2.00 PLN.

How we cost a delivery route

Daily cost = fuel + driver + vehicle. Fuel is kilometres × (l/100 km ÷ 100) × price per litre. Driver is hours × rate. Vehicle is the monthly cost divided by feeding days.

Transport per facility and per portion is that same day divided by stops or portions. Minimum portions = day cost ÷ the PLN-per-portion cap. Maximum distance: from cap × portions subtract driver and van, then divide by the fuel cost per kilometre.

Driver time is entered separately — a longer loop does not add hours on its own. If 20 km extra is 25 minutes extra at the wheel, raise the hours. The calculator does not know traffic or a second run.

When the route eats the margin

The PLN-per-portion cap is not a guess

Take the set price minus food, packaging and kitchen from the contract calculator. What remains can partly go to delivery. If lunch is 18 PLN and food takes 9 PLN, a 1.50 PLN transport cap is cautious — 3 PLN already hurts.

One loop, not the whole fleet

Four kindergartens on the morning run are separate from an afternoon diet-box round. Vans that sit still still cost money — but this calculator asks about the loop you want to judge before adding a fifth facility 40 km further on.

Kilometres stay put, portions do not

The loop is 72 km whether you issue 250 portions or 180. A drop in attendance raises the cost per lunch, because the van still goes. Dietido collects facility orders — then you know whether the route still has the minimum portions before the driver leaves.

Delivery routes: common questions

How do I cost a catering delivery route?

Add fuel (km × consumption × price per litre), driver time and the daily van cost. That is the day. Divide by facilities and by portions. The month is the day × feeding days.

What sets the minimum portions on a route?

The day cost and the PLN-per-portion cap. If the day costs 255 PLN and you accept 1.50 PLN of transport in the lunch, you need 170 portions. Below that, delivery eats more margin than you allowed.

How do you calculate the maximum profitable distance?

In this model the driver and the van are a fixed cost of the day. Fuel grows with kilometres. Cap × portions minus the fixed costs, divided by PLN/km from fuel, is the longest loop. Extra distance without extra driver hours is therefore optimistic.

Is vehicle cost the same as fuel?

No. Fuel is separate. Vehicle cost is the lease or instalment, insurance, service, tyres and depreciation of this van per month. If the van runs two routes, enter half.

How is this different from the contract profitability calculator?

That one costs a single facility: food, kitchen, margin and the child threshold. This one costs a loop: several stops, a van and a driver. Check first that the route is not too long, then that the contract at the stop holds.

The loop is on the map. Portions come from orders.

On the demo we show how Dietido collects facility counts and builds packing order by route — instead of a fixed 72 km and a guessed attendance.

Book a free demo

20 minutes online · no commitment